The Birds Eye factory was built in 1985 next to the North Sea. The sea air had caused extensive corrosion to the roof sheets, gutterings and edge laps.
The roof at the factory was 8,000sqm, and the project took 3 months to complete.
Factory Roof Repair
We carried out the following industrial roof repairs and refurbishment:
Replacement of all barge flashing for new
Replacement of entire roof ridge for new
Pressure washing and degreasing of entire roof to remove all contamination
Treatment & repair of cut edge corrosion using Rustoleum Noxyde, anti-corrosion system
Where necessary, replacement of non-reparable edge laps for new
Noxyde edge lap tape system applied
Industrial roof coating – 2 coats of Rustoleum Noxyde, spray applied, to achieve a 15 year guarantee
15 year manufacturer and company guarantee for waterproofing and anti-corrosion within a C5-M environment.